
my closest frens since secondary school days...

MAHJONG! managed to squeeze 2 tables into the room..haha

for those of us who have no MJ to play, its TABOO time!
Marriage is not a ritual or an end. It is a long, intricate, intimate dance together and nothing matters more than your own sense of balance and your choice of partner. - Amy Bloom







we welcome any other suggestions if you have thought of other items that are not listed above.


Well, our bathrooms were (past tense now) grey as both of us liked the idea of the dark bathroom. It gives the modern and classy feeling. But then again, since my in-laws doesn't like it, and also mama and papa mentioned it before, we decided to change with much reluctance. Besides the part that we have no more dream bathrooms, there will be cost incurred and delay in handover.
Since this is something that we have no control over, we decided to be optimistic. Went to the bookstores today to check out some ideas of bathroom design. Kind of choosen a brighter colour, light earth tone. It looks nice and classy from the design books and hope ours will have the same effect. Looking on the brighter side, we can take this chance to re-route the piping, so that hopefully, they can be concealed, and also, for the designer to remeasure the size and distance of the vanity cabinet to the toilet bowl. Come to think of it, it may be a blessing in disguise. In any case, everybody is happy, and that is the most important.
Anyway due to all these changes, the handover date (originally next week) is estimated to be end of august but I have already requested it to be slightly earlier as hubby will be moving in early sept. Hope everything turns out well.








1) Went back to Royal Fanco to buy the rest of the toilet accessories, like the towel bar, toilet paper holder, etc.
2) Bought a Blanco granite sink and tap from Hoe Kee.
3) On the very last day of the month of June (yes, just before the start of 2% GST), we bought a Simmons mattress from this shop in Toa Payoh which was highly recommended in the forum. Manage to negotiate for 2 more Simmons pillows on top of the 2 that were given originally. *grins*
I can't remember what else we bought, that should be all. At the same time, he bought a few shirts for our photoshoot and I bought my heels for ROM. I loved my heels and its ex! Hope I can walk properly.




Went for dinner at 9pm at Ka Soh at Amoy Street after I selected my ROM dress. Not telling you how it looks like, except that it will be in ivory. Be prepared to be surprised! *grins*







The process goes:
ID submit online to HDB at TPY. HDB at TPY check and approve. Send to town council in charge. And town council issue permit.
Finally I understood, and my designer also understood now, so he promised to rush the side view drawings out by today and resubmit. Hopefully, the permit can be approved by this week.
Yesterday, Hao received a call from our co-designer saying he just called HDB and the permit is STILL not done yet! I wonder what is wrong. I would have expected them to call HDB after 2 weeks of submission to check but until now, we still have not got our permit! Today, he called Hao again, and told him that the permit is still not approved and we cannot have the aircon installer to go down on thursday! ARGGHHH!! We were quite pissed. In the end, we arranged with the aircon installer to meet on next monday (when the both of us will be working!). What to do??!!! Sigh, we have already been delayed by this for more than 1 week. I hope they can manage to finish by the scheduled time to avoid clashing with the lunar 7th month.